{"id":6571,"date":"2026-09-09T09:00:00","date_gmt":"2026-09-09T06:00:00","guid":{"rendered":"https:\/\/track.com.tr\/?p=6571"},"modified":"2026-08-27T10:03:50","modified_gmt":"2026-08-27T07:03:50","slug":"deniz-yapilari-muteahhitlerinin-neden-ortak-bir-dijital-altyapiya-ihtiyaci-var-her-zamankinden-daha-fazla","status":"publish","type":"post","link":"https:\/\/track.com.tr\/en\/deniz-yapilari-muteahhitlerinin-neden-ortak-bir-dijital-altyapiya-ihtiyaci-var-her-zamankinden-daha-fazla\/","title":{"rendered":"WHY MARINE CONTRACTORS NEED A UNIFIED DIGITAL BACKBONE: NOW MORE THAN EVER"},"content":{"rendered":"\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-1 wp-block-paragraph\">In the world of marine contracting, complexity is a given. Whether&nbsp;it\u2019s&nbsp;installing offshore wind farms, dredging ports, or managing subsea infrastructure, marine contractors&nbsp;operate&nbsp;in some of the most demanding environments on the planet. These projects are high-stakes, asset-intensive, and often executed across multiple geographies under tight timelines and even tighter margins.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-2 wp-block-paragraph\">And yet, many marine contractors still rely on fragmented&nbsp;systems: spreadsheets&nbsp;for project costing, siloed maintenance tools, and disconnected financial systems. The result? Delayed insights, reactive decision-making, and missed opportunities to protect margins and improve performance.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-3 wp-block-paragraph\">It\u2019s&nbsp;time for a change.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-4 wp-block-paragraph\"><strong>The Case for Integration&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-5 wp-block-paragraph\">Marine contractors face a unique dual challenge: they must deliver complex, multi-party projects while simultaneously managing fleets of high-value, mobile assets like vessels, rigs, and&nbsp;remotely&nbsp;operated vehicles (ROVs). These two worlds, project execution and asset management, are deeply intertwined. A delay in vessel maintenance can derail a project timeline. A missed certification can halt operations. A lack of real-time cost visibility can erode margins before anyone notices.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-6 wp-block-paragraph\">What\u2019s needed is a unified digital backbone that connects these domains\u2013a platform that provides real-time visibility across projects, assets, and finances and a system that enables proactive decisions, not just post-mortem analysis.<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-7 wp-block-paragraph\"><strong><strong>Enter IFS Cloud\u00a0<\/strong><\/strong><\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"563\" height=\"273\" src=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-15.png\" alt=\"\" class=\"wp-image-6566 size-full\" srcset=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-15.png 563w, https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-15-300x145.png 300w\" sizes=\"auto, (max-width: 563px) 100vw, 563px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-8 wp-block-paragraph\">IFS Cloud is purpose-built for industries like marine contracting. It brings together project financial control, enterprise asset management, procurement, HSEQ, and more\u00a0on a single, integrated platform. This\u00a0isn\u2019t\u00a0about bolting on modules or customizing generic ERP.\u00a0It\u2019s\u00a0about delivering a solution that understands the marine contractor\u2019s world from the inside out.\u00a0<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-9 wp-block-paragraph\">ERP.&nbsp;It\u2019s&nbsp;about delivering a solution that understands the marine contractor\u2019s world from the inside out.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-10 wp-block-paragraph\">With IFS Cloud, marine contractors can:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li class=\"has-light-black-color has-text-color has-link-color wp-elements-11\">Gain real-time control over project costs, margins, and forecasts.\u00a0<\/li>\n\n\n\n<li class=\"has-light-black-color has-text-color has-link-color wp-elements-12\">Automate cash flow planning based on live\u00a0project\u00a0and procurement data.\u00a0<\/li>\n\n\n\n<li class=\"has-light-black-color has-text-color has-link-color wp-elements-13\">Maximize asset uptime with predictive maintenance and mobile work execution.\u00a0<\/li>\n\n\n\n<li class=\"has-light-black-color has-text-color has-link-color wp-elements-14\">Ensure compliance with class society certifications and safety regulations.\u00a0<\/li>\n\n\n\n<li class=\"has-light-black-color has-text-color has-link-color wp-elements-15\">Standardize processes across global operations for consistency and scalability.\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-16 wp-block-paragraph\"><strong>Real-World Momentum&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-17 wp-block-paragraph\">We\u2019re&nbsp;seeing strong momentum in the industry. Companies like Van Oord, Fugro, and&nbsp;Dixstone&nbsp;have chosen IFS Cloud to support their transformation journeys. While each is at a different stage, some implementing, others&nbsp;optimizing, the direction is clear: marine contractors are moving toward integrated, cloud-based platforms that can scale with their ambitions.&nbsp;iyor.\u00a0<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-18 wp-block-paragraph\"><strong><strong>Looking Ahead\u00a0<\/strong><\/strong><\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"495\" height=\"330\" src=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-16.png\" alt=\"\" class=\"wp-image-6567 size-full\" srcset=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-16.png 495w, https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-16-300x200.png 300w\" sizes=\"auto, (max-width: 495px) 100vw, 495px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-19 wp-block-paragraph\">The marine contracting industry is evolving fast. The energy transition is opening new markets. Projects are becoming more complex. Clients are demanding greater transparency, predictability, and sustainability.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-20 wp-block-paragraph\">To meet these demands, marine contractors need more than just tools, they need a strategic partner that can help them unify their operations, adapt to change, and unlock new value from their data.<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">SOURCE: Chris Thomassen ( 2026 April 21) Why Marine Contractors Need a Unified Digital Backbone: Now More Than Ever. IFS Blog. <a href=\"https:\/\/blog.ifs.com\/why-marine-contractors-need-a-unified-digital-backbone\">https:\/\/blog.ifs.com\/why-marine-contractors-need-a-unified-digital-backbone<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the world of marine contracting, complexity is a given. Whether&nbsp;it\u2019s&nbsp;installing offshore wind farms, dredging ports, or managing subsea infrastructure, marine contractors&nbsp;operate&nbsp;in some of the most demanding environments on the planet. These projects are high-stakes, asset-intensive, and often executed across multiple geographies under tight timelines and even tighter margins.&nbsp; And yet, many marine contractors still<\/p>\n","protected":false},"author":2,"featured_media":6568,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[52],"tags":[],"class_list":["post-6571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts\/6571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/comments?post=6571"}],"version-history":[{"count":1,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts\/6571\/revisions"}],"predecessor-version":[{"id":6573,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts\/6571\/revisions\/6573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/media\/6568"}],"wp:attachment":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/media?parent=6571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/categories?post=6571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/tags?post=6571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}