{"id":6596,"date":"2026-09-16T09:00:00","date_gmt":"2026-09-16T06:00:00","guid":{"rendered":"https:\/\/track.com.tr\/?p=6596"},"modified":"2026-08-27T14:16:02","modified_gmt":"2026-08-27T11:16:02","slug":"zanaatten-sisteme-endustriyellesmis-insaati-sekillendiren-uc-tema","status":"publish","type":"post","link":"https:\/\/track.com.tr\/en\/zanaatten-sisteme-endustriyellesmis-insaati-sekillendiren-uc-tema\/","title":{"rendered":"FROM CRAFT TO SYSTEM: THREE THEMES SHAPING\u00a0INDUSTRIALIZED CONSTRUCTION"},"content":{"rendered":"\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-1 wp-block-paragraph\">I&nbsp;recently&nbsp;had the privilege of delivering a keynote at&nbsp;<a href=\"https:\/\/www.comit.org.uk\/event-details-registration\/comit-community-day-19th-march-2026\" target=\"_blank\" rel=\"noopener\">COMIT Community Day&nbsp;2026<\/a>, which was held&nbsp;on Thursday, March 19&nbsp;in London. COMIT has&nbsp;been promoting innovation across the UK construction, operations, and maintenance sectors for over 20 years now,&nbsp;bringing together asset owners, contractors, technology providers, and academia to share&nbsp;best practices and push the industry forward. It felt like the right room,&nbsp;and the right moment,&nbsp;to have an honest conversation about where&nbsp;the construction&nbsp;industry stands, and where it needs to go.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-2 wp-block-paragraph\">The theme of the&nbsp;event centered on something that has been occupying my thinking for a while: how we move construction from a craft-based industry into one that&nbsp;operates&nbsp;with the rigor, repeatability, and efficiency of a modern industrial system.&nbsp;Think this is too long could we edit it to be shorter:&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-3 wp-block-paragraph\">That might sound like a bold ambition. But every conversation&nbsp;I\u2019ve&nbsp;had over the past year with leaders from across the sector, from&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/generalcontractors\" target=\"_blank\" rel=\"noopener\">general contractors<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/speciality-contractors\" target=\"_blank\" rel=\"noopener\">specialty contractors<\/a>&nbsp;to engineering\u2011procure\u2011construct&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/choosing-software-for-epc\" target=\"_blank\" rel=\"noopener\">(EPC)&nbsp;contractors<\/a>&nbsp;,&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/building-more-faster-current-state-of-residential-property-development\" target=\"_blank\" rel=\"noopener\">residential contractors<\/a>&nbsp; and&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/ifs-cloud-for-marine-contractors\" target=\"_blank\" rel=\"noopener\">marine contractors<\/a>&nbsp;has reinforced the same conclusion. The old ways of working are holding companies back.&nbsp;And the&nbsp;first&nbsp;organizations&nbsp;that&nbsp;recognize&nbsp;this will be the ones that thrive&nbsp;the most by gaining first-mover&nbsp;advantage of&nbsp;market share.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-4 wp-block-paragraph\">What struck me most in those discussions was the scale of the challenges: shrinking project margins, escalating risk, and stagnating productivity. Just as importantly, I was struck by how remarkably consistent these challenges are across every sub\u2011sector of our industry.&nbsp;Whether I was talking to a property developer or the head of a&nbsp;ship&nbsp;fabrication yard, the pain points were the same&nbsp;and so, I believe, is the path forward.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-5 wp-block-paragraph\">Those conversations&nbsp;inspired&nbsp;the presentation I&nbsp;gave&nbsp;at the&nbsp;COMIT&nbsp;event, titled&nbsp;\u2018<em>From Craft to System: The Industrialization of Construction<\/em>\u2019.&nbsp;I structured my keynote around three themes that I think capture the shift our industry needs to make:&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-light-black-color has-text-color has-link-color wp-elements-6\"><strong><strong>Theme 1: Why the\u00a0Construction and Engineering\u00a0Industry Must Change and Why It Hasn\u2019t Yet\u00a0<\/strong><\/strong><\/h4>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-7 wp-block-paragraph\">The first theme I explored was the simplest\u00a0to state\u00a0and the hardest to act on: the construction industry needs to change, fundamentally, and the\u00a0barriers are\u00a0as much\u00a0cultural as they are technical.\u00a0<\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"533\" height=\"299\" src=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-18.png\" alt=\"\" class=\"wp-image-6589 size-full\" srcset=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-18.png 533w, https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-18-300x168.png 300w\" sizes=\"auto, (max-width: 533px) 100vw, 533px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-8 wp-block-paragraph\">Consider the challenges every construction\u00a0business faces today. Project margins are under constant pressure\u00a0because risk is\u00a0rising,\u00a0from\u00a0supply chain disruption to regulatory complexity. Productivity has flatlined while\u00a0almost every\u00a0other major industry has found ways to do more with less. And sustainable growth, the kind that\u00a0doesn\u2019t\u00a0depend on simply winning more projects and hiring more people,\u00a0remains\u00a0elusive for most firms.\u00a0<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-9 wp-block-paragraph\">When I asked industry leaders why these problems persist, a pattern&nbsp;emerged&nbsp;quickly. There is precious little standardization of processes across the sector. Instead, we have disjointed, silo-based processes and systems that make it extraordinarily difficult to achieve the kind of integrated, end-to-end visibility that other industries&nbsp;such as manufacturing&nbsp;take for granted.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-10 wp-block-paragraph\">This fragmentation is not just inefficient. It actively prevents the&nbsp;engineering and construction&nbsp;industry from adopting the technologies and methodologies&nbsp;of&nbsp;AI to advanced&nbsp;predictive&nbsp;analytics&nbsp;that could transform&nbsp;business&nbsp;performance. You cannot layer intelligence onto a foundation of disconnected spreadsheets and siloed project data. And that&nbsp;realization&nbsp;leads directly to the second theme.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-light-black-color has-text-color has-link-color wp-elements-11\"><strong><strong>Theme 2: From Craft to System,\u00a0Building the Digital\u00a0Backbone\u00a0<\/strong><\/strong><\/h4>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"543\" height=\"363\" src=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-19.png\" alt=\"\" class=\"wp-image-6590 size-full\" srcset=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-19.png 543w, https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-19-300x201.png 300w\" sizes=\"auto, (max-width: 543px) 100vw, 543px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-12 wp-block-paragraph\">The heart of my presentation was about what it&nbsp;looks&nbsp;like to move from craft-based working to a systems-based approach,&nbsp;which is&nbsp;built on integrated, standardized, and repeatable processes.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-13 wp-block-paragraph\">In practical terms, this means rethinking how we manage the entire project lifecycle.&nbsp;This covers the full lifecycle: from&nbsp;bidding to contract, through design, estimation, planning, and scheduling; then procurement and manufacturing; followed&nbsp;by construction and installation; and finally, the&nbsp;operate-and-maintain&nbsp;phase.Today, most construction&nbsp;businesses handle each of these stages with different tools, different teams, and different data. The result is a fragmented picture where nobody has true visibility across the full lifecycle of a project.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-14 wp-block-paragraph\">What I showed the audience was how&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/a-futureproof-digital-erp-backbone\" target=\"_blank\" rel=\"noopener\">modern ERP platforms<\/a>&nbsp;provide a unified&nbsp;solution&nbsp;that connects all of these stages within a single digital backbone.&nbsp;Replacing every tool overnight isn\u2019t the goal. The immediate priority is to build a connected foundation. This includes CRM and pipeline management, estimating and tender responses, bill of quantities and scope definition, project costing and forecasting,&nbsp;<a href=\"https:\/\/www.ifs.com\/en\/insights\/assets\/ai-enhanced-supply-chain-management\" target=\"_blank\" rel=\"noopener\">supply chain<\/a>&nbsp;and sub\u2011contract management, materials management, and the processes for payment certificates and retentions.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-15 wp-block-paragraph\">The connected Project&nbsp;Bill of Material (BOM) sits at the center of this approach. It enables teams to coordinate design, procurement, manufacturing, shipping, installation, and handover as a single, integrated process rather than a series of disconnected handoffs.&nbsp;When the&nbsp;BOM is connected and live, decisions made in design ripple&nbsp;through&nbsp;to&nbsp;procurement&nbsp;and scheduling in real time. That is the difference&nbsp;between craft and system.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-16 wp-block-paragraph\">Critically, this digital&nbsp;backbone is also&nbsp;<a href=\"https:\/\/ifs.sharepoint.com\/sites\/Campaigns\/SitePages\/Harnessing-AI-in-Construction-%26-Engineering(1).aspx\" target=\"_blank\" rel=\"noopener\">what enables meaningful AI adoption<\/a>. Industrial AI,&nbsp;the kind that solves real-world problems on real&nbsp;projects, needs&nbsp;clean, structured, connected data to work with. Without the&nbsp;backbone, AI&nbsp;remains&nbsp;a pilot. With it, AI&nbsp;becomes a practical tool for forecasting, risk management, and decision support across the project lifecycle.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-light-black-color has-text-color has-link-color wp-elements-17\"><strong>Theme 3: The New Hybrid Model:&nbsp;Turning Challenges into Competitive Advantage&nbsp;<\/strong><\/h4>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"478\" height=\"250\" src=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-20.png\" alt=\"\" class=\"wp-image-6591 size-full\" srcset=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-20.png 478w, https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-20-300x157.png 300w\" sizes=\"auto, (max-width: 478px) 100vw, 478px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-18 wp-block-paragraph\">The third theme I shared was about the future state: a new hybrid model that&nbsp;blends the&nbsp;best of&nbsp;construction-centric and engineering and manufacturing-centric approaches.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-19 wp-block-paragraph\">Traditionally, construction has&nbsp;operated on&nbsp;a&nbsp;bill of quantities model. You define the scope, measure the quantities, price them, and manage the project against that framework. Engineering and manufacturing&nbsp;businesses,&nbsp;by contrast,&nbsp;operate&nbsp;on a&nbsp;bill of materials&nbsp;models&nbsp;that&nbsp;track individual components through design, procurement, manufacture, and assembly with&nbsp;serialized&nbsp;traceability. These two worlds have&nbsp;largely operated&nbsp;in parallel.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-20 wp-block-paragraph\">The new hybrid model brings them together. It&nbsp;recognizes&nbsp;that&nbsp;modern construction,&nbsp;especially with the growth of prefabrication and modular methods,&nbsp;increasingly involves manufacturing-style processes alongside traditional site-based work. A project might involve&nbsp;standardized&nbsp;materials and components, structured work packages with part and tag numbering, inventory control and&nbsp;logistics, Building&nbsp;Information&nbsp;Modeling&nbsp;(BIM)&nbsp;&nbsp;integration, and shipping, kitting, and assembly packages all feeding into an evolving project bill of material that culminates in a digital asset handover.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-21 wp-block-paragraph\">This is where the real prize sits. When you&nbsp;standardize&nbsp;your coding, your processes, and your materials, and you connect them through an integrated&nbsp;ERP&nbsp;platform, you do not just improve efficiency on a single&nbsp;project,&nbsp;you&nbsp;build a repeatable system that improves with every project you deliver. The industry challenges that once felt&nbsp;intractable,&nbsp;margins, risk, productivity, control, sustainable growth,&nbsp;become competitive advantages for the&nbsp;organizations&nbsp;that embrace this&nbsp;approach.&nbsp;The asset itself is created as a&nbsp;serialized&nbsp;record in a maintenance repository, meaning the handover from construction to operations is seamless rather than the painful data re-entry exercise it so often is today.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-22 wp-block-paragraph\"><strong><strong>Looking Forward\u00a0<\/strong><\/strong><\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"531\" height=\"301\" src=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-21.png\" alt=\"\" class=\"wp-image-6592 size-full\" srcset=\"https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-21.png 531w, https:\/\/track.com.tr\/wp-content\/uploads\/2026\/08\/image-21-300x170.png 300w\" sizes=\"auto, (max-width: 531px) 100vw, 531px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-23 wp-block-paragraph\">Standing in front of the COMIT community, I was struck by the energy and willingness to change in the room. The conversations&nbsp;I\u2019ve&nbsp;had with leaders across our sector tell me the appetite for transformation is real.&nbsp;The technology&nbsp;to enable it&nbsp;exists.&nbsp;What\u2019s&nbsp;needed now is&nbsp;the conviction to&nbsp;move,&nbsp;&nbsp;to&nbsp;stop treating each project as a one-off craft exercise and start building the systems, processes, and digital foundations that will define the next era of construction.&nbsp;<\/p>\n\n\n\n<p class=\"has-light-black-color has-text-color has-link-color wp-elements-24 wp-block-paragraph\">The shift from craft to system is not a future aspiration. It is happening now, project by project, across&nbsp;organizations&nbsp;that have decided to lead rather than wait. If&nbsp;the COMIT Community Day 2026&nbsp;event reinforced one thing, it is that the construction industry\u2019s moment&nbsp;to shine,&nbsp;where reliability, safety, and performance truly matter,&nbsp;demands nothing less.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">SOURCE: Kenny Ingram (2026 March 25) From Craft to System: Three Themes Shaping Industrialized Construction. IFS Blog. <a href=\"https:\/\/blog.ifs.com\/from-craft-to-system-three-themes-shaping-industrialized-construction\">https:\/\/blog.ifs.com\/from-craft-to-system-three-themes-shaping-industrialized-construction<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>I&nbsp;recently&nbsp;had the privilege of delivering a keynote at&nbsp;COMIT Community Day&nbsp;2026, which was held&nbsp;on Thursday, March 19&nbsp;in London. COMIT has&nbsp;been promoting innovation across the UK construction, operations, and maintenance sectors for over 20 years now,&nbsp;bringing together asset owners, contractors, technology providers, and academia to share&nbsp;best practices and push the industry forward. It felt like the right<\/p>\n","protected":false},"author":2,"featured_media":6593,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[52],"tags":[],"class_list":["post-6596","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts\/6596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/comments?post=6596"}],"version-history":[{"count":2,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts\/6596\/revisions"}],"predecessor-version":[{"id":6598,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/posts\/6596\/revisions\/6598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/media\/6593"}],"wp:attachment":[{"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/media?parent=6596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/categories?post=6596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/track.com.tr\/en\/wp-json\/wp\/v2\/tags?post=6596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}