Home
Corporate
About Us
Our Services
Solutions
Production
Project
Service
Supply Chain
Finance
Human Resources
Industries
Machinery Industry
IFS ERP Automotive Industry Solutions
Electrical & Electronics Industry
Furniture & Accessories Sector
Construction-Shipbuilding and Infrastructure Industry
Aerospace & Defense Industry Sector
Oil and Gas Industry
Service Providers
Food Industry
Chemical Industry
Paper Industry
Mining Industry
Our Projects
Articles
Digital Maturity Survey
Contact
Book a demo
Linkedin
Youtube
Instagram
Digital Maturity Survey for the Shipbuilding (Shipyard) Industry
Home
Digital Maturity Survey for the Shipbuilding (Shipyard) Industry
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Full Name
*
E-mail
*
Company Name
This survey measures your firm’s ability to manage Design-to-Production integration, Advanced Resource Planning, and Critical Certification processes. (Scoring for Response Options: 1 = Never/Manual, 5 = Fully/Integrated)
Section A: Design, PLM, and Project Integration
This section measures the process from ship design (PLM) to project management and certification tracking.
A1. Are the Bill of Materials (BOM) and 3D models generated by the design (CAD/PLM) system automatically transferred to the procurement and production planning systems without manual intervention?
*
1
2
3
4
5
A2. Are project budgets, Work Breakdown Structure (WBS), and schedule progress continuously compared with actual costs and labor hours in real time?
*
1
2
3
4
5
A3. Are certification and approval requirements from classification societies and authorities automatically integrated into procurement and production planning?
*
1
2
3
4
5
A4. When a design change (ECO) occurs in a project, can its impact on cost and delivery date be quickly simulated within the system?
*
1
2
3
4
5
documentation status Are
A5. Is the capacity planning and reservation system for resources critical to project completion (e.g., scaffolding, dry docks, cranes) managed centrally?
*
1
2
3
4
5
Section B: Procurement, Inventory, and Production Control
This section measures long lead material procurement, on site fabrication processes, and assembly logistics.
B1. Are the ordering processes for long lead items managed by considering not only scheduling but also certification stages?
*
1
2
3
4
5
B2. Are all plates, profiles, and equipment entering or leaving the shipyard area tracked for inventory and logistics by being linked to the correct zone and block?
*
1
2
3
4
5
B3. Are detailed lean production routes followed and real-time data collected for the fabrication and assembly of critical sub components (piping, panels, electrical cables)?
*
1
2
3
4
5
B4. Are assembly logistics and staging processes optimized by the system to ensure that components are at the correct block at the right time for final assembly?
*
1
2
3
4
5
B5. Is there 100% traceability for batch/lot numbers of all raw materials used in welding, painting, and other critical production processes, down to the final ship blocks?
*
1
2
3
4
5
Section C: Quality, Inspection, and Post Delivery Management
This section measures the high quality standards mandated by the industry, inspection processes, and warranty tracking.
C1. Are all Non-Conformance Reports (NCR), Corrective Action Reports (CAR), and their related processes from classification societies and customer inspections managed within a centralized system?
*
1
2
3
4
5
C2. Is the documentation required for all Test & Acceptance Procedures (HAT/SAT) before ship delivery automatically generated by the system?
*
1
2
3
4
5
C3. After ship delivery (during the warranty period), can failures and repairs be linked back to the specific production block and the component supplier?
*
1
2
3
4
5
C4. Are personnel and machine certifications such as welder certificates, test procedures, and equipment calibrations automatically tracked with validity expiration alerts?
*
1
2
3
4
5
C5. Is the progress status at different construction phases (Block, Assembly, Outfitting) reported in integration with the relevant WBS and cost data?
*