Home
Corporate
About Us
Our Services
Solutions
Production
Project
Service
Supply Chain
Finance
Human Resources
Industries
Machinery Industry
IFS ERP Automotive Industry Solutions
Electrical & Electronics Industry
Furniture & Accessories Sector
Construction-Shipbuilding and Infrastructure Industry
Aerospace & Defense Industry Sector
Oil and Gas Industry
Service Providers
Food Industry
Chemical Industry
Paper Industry
Mining Industry
Our Projects
Articles
Digital Maturity Survey
Digital Maturity Survey for the Electrical & Electronics Industry
Contact
Book a demo
Linkedin
Youtube
Instagram
Digital Maturity Survey for the Electrical & Electronics Industry
Home
Digital Maturity Survey for the Electrical & Electronics Industry
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Full Name
*
E-mail
*
Company Name
This survey measures your company’s capabilities in Supply Chain Resilience, Production Agility, and Revision Control. (Scoring for Response Options: 1 = Never/Manual, 5 = Fully/Integrated)
Section A: Product Lifecycle and Revision Control (PLM)
This section measures the speed of transitioning a product from design to production and the management of revisions throughout the process.
A1. Does the BOM generated in the design (CAD/PLM) system automatically flow into the manufacturing and procurement systems without manual input?
*
1
2
3
4
5
A2. Are product hardware and software revisions (HW/SW) monitored in a single central system across production and service processes?
*
1
2
3
4
5
A3. When launching a new product (NPI), does the system automatically plan and reserve all necessary resources (materials, equipment, and labor?)
*
1
2
3
4
5
A4. Does the system automatically identify when a product reaches end-of-life (EOL) or a critical component is worn out, and trigger the search for replacement parts?
*
1
2
3
4
5
A5. During the sales quotation phase, does the system automatically create the correct BOM, routing, and cost estimate for customer-specific configurations (CTO)?
*
1
2
3
4
5
Section B: Supply Chain and Material Management
This section measures global supply chain risks, material shortages, and inventory optimization.
C: the manufacturing
B1. Does the system automatically perform risk and forecasting analyses for critical components with long lead times or significant price fluctuations?
*
1
2
3
4
5
B2. Does the system automatically switch to a backup/alternative supplier in the event of a disruption at a primary supplier (e.g., fire, port closure)?
*
1
2
3
4
5
B3. Does your warehouse management system (WMS) automatically guide product placement and picking based on location, expiration dates (FEFO/FIFO), and serial numbers of critical components?
*
1
2
3
4
5
B4. Do abrupt and large changes in sales forecasts get instantly and automatically incorporated into supply and production schedules?
*
1
2
3
4
5
B5. Does the system automatically block critical components (e.g., semiconductors) from entering production based on their Quality Control (QC) results?
*
1
2
3
4
5
Section C: Production Control and Quality Traceability
This section measures the speed and accuracy of shop floor processes as well as traceability after delivery.
C1. For each board or device in production, are the lot/serial numbers of all components used recorded in real time (Serial Tracking)?
*
1
2
3
4
5
C2. Does the system track defect detection and rework processes in detail, ensuring that every rework step is correctly accounted for in the costs?
*
1
2
3
4
5
C3. Can field technicians instantly access the warranty and revision history of a faulty device at the customer site (based on records from A2) via their mobile devices?
*
1
2
3
4
5
C4. Does the system automatically associate and archive production test and calibration results (e.g., PCB tests) with the relevant product serial numbers?
*
1
2
3
4
5
C5. Does the system systematically transfer failure data from warranty processes of sold products to the Engineering team to support improvements in future designs?
*
1
2
3
4
5
Send