There’s a particular kind of loss that never makes it into a board report. It’s not a single catastrophic failure or a headline-grabbing outage. It’s the maintenance window that slipped by only an hour that delayed everything after that, the production plan that was already obsolete by the time it reached the people executing it, or the senior engineer who retired last










